Horrendously dangerous as done by HE and South Gloucester council
Busy motorway junction, they've just narrowed the lanes and the alternative for cyclists/pedestrians is appalling.
limited to the area of Bristol Cycling Campaign:
6 issues found for 'junction':
Busy motorway junction, they've just narrowed the lanes and the alternative for cyclists/pedestrians is appalling.
Created by Eric Booth // 0 threads
Cycle path is broken up by cars coming off the dual carriageway into the hotel (before a barrier). So a cyclist not only has to stop, but then turn around and look behind them for cars careening off the dual carriageway into the hotel.
Raised on CTC Infrastructure map http://www.ctc.org.uk/campaign/space-for-cycling/cycling-infrastructure/filton-holiday-express-inn
Created by Sam Saunders // 1 thread
Twice in recent days I have encountered ambiguity over right of way when cycling westward from the shared foot/cycle path on Clift House Road, across an entrance road and onto the new continuation path towards Ashton Avenue Bridge. Four lanes of merging traffic are travelling eastbound and occasionally one vehicle will turn off the main road into the access road. While I might assume that having started to cross this road I have right of way over a vehicle turning into it, the road markings and the sheer size of the junction make it unclear as to what ought to happen. It might be that the left turning traffic should have to negotiate a much more obvious turning, rather than the wide sweep that allows the turn to be made at full speed.
Created by Sam Saunders // 1 thread
Busy Ashton Road (a 20 mph road from the A3029) bends eastward into the commercial area of North Street, close to a well-used park. On the bend, immediately adjacent to a park entrance, Frayne Street brings one-way traffic from the north west, and allows cycles to travel in the opposite direction towards Cumberland Basin. Coronation Road has two way traffic on the north east side.
A recently installed calming measure has narrowed the road on the bend, as shown in the picture. The irregular shape of the road that results has made the turn into Coronation Road awkward for cyclists and, as can be seen from the lower half of the picture, some cyclists take ad hoc routes to avoid the complication. Buses and large lorries also use the route into North Street and most vehicles take the bend at about 30 mph, despite the speed restriction.
As a route for cyclists, there could be a continuous segregated lane alongside the park (perhaps shaving a metre from the park itself, crossing Frayne Road with priority and following Coronation Road eastbound. A large number of school children use the route along the park every day but only a very few use a bicycle.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
45 threads found for 'junction':
A discussion on issue
14/0028/OUT up to 69 houses/apartments off Coldhams Lane And Hatherdene Close, Cambridge
Matthew Danish
posted
A discussion on issue
Tennyson Road Crossing NCN 1&11 King's Lynn
Rob Archer
posted
Trust Pathways
A discussion on issue
Hazardous junction: Potters Bank and Elvet Hill Road
MWright
posted
A discussion on issue
Upgrade footway on Wherestead Road over A14 to allow cycling and sign
Andrea Bredel
posted
A discussion on issue
Poor visibility junction
Cyclewise
posted
A discussion on issue
Poor visibility junction
DavidT
posted
A discussion on issue
Changes on Cherry Hinton Road approach to Hills Road
Martin Lucas-Smith
posted
St Albans Cycle Campaign
A discussion on issue
Aincent Briton junction redesign
mike1727
posted
Camden Cyclists
A discussion on issue
Consultation on Cobden Junction
Jean Dollimore
posted
Camden Cyclists
A discussion on issue
Consultation on Cobden Junction
Mixhael
posted
Bristol Cycling Campaign
A discussion on issue
Awkward Junction For Cyclists in 20 mph Zone
Eric Booth
posted
A discussion on issue
Ambiguous Junction For Cycle Path at Clift House Road
christhebull
posted
Bristol Cycling Campaign
A discussion on issue
Unsuitable and Narrow Cyce Lane On Junction of Woodland Road And Park Row in Bristol
Eric Booth
posted
A discussion on issue
Impermeable junction
James Avery
posted
A discussion on issue
TfL Consultation: Further safety improvements at Bow roundabout
Shaun McDonald
posted
A discussion on issue
TfL Consultation: Initial safety improvements at Waterloo (IMAX) roundabout
Shaun McDonald
posted
A discussion on issue
TfL Consultation: Proposed improvements at the junction of Mile End Road and Burdett Road
Shaun McDonald
posted
A discussion on issue
TfL Consultation: Proposed banned left turn from Tower Bridge Road into Abbey Street
Gerhard Weiss
posted
A discussion on issue
Parkway approach to Britannia Junction too narrow
cycleoptic
posted
Bromley Cyclists
A discussion on issue
Elmers End junction
Shaun McDonald
posted
2 library items found for 'junction':
No planning applications found for 'junction'.